Monday, September 15, 2008

Two and half down, one to go!

Saturday didn't start out as a great day. A storm moved through on Friday, which may have contributed to the way I was feeling. I really needed to spend some time on the floor, though, as September is fast slipping away, and it looks like I'll be traveling for a week or so this month, further limiting my time.

Finally by about 11 a.m. on Saturday, I was able to get started on the floor in Lourdes' office. She's been patiently waiting but dropping many hints. I have really been wanting to get this done, but the hallway took longer than anticipated. Actually, I still have 2 pieces of trim to do at the top of the stairs, but I'm not sure I'm going to use the FasTrim pieces I bought. I want to think about this a little more.

I had watched a few laminate flooring installation videos on YouTube the week before, and realized that using a "pull bar" in certain places might be helpful. I had been using a crow bar and some scrap pieces, but the videos made it look so easy with the pull bar. A friend had offered to lend me his, so I took him up on the offer. I chipped the first piece I went to install around the doorway with the pull bar, though. Ah, lesson learned: Use scrap pieces on the edge (if the scrap chips, it doesn't matter).

Once I got through the doorway and into the main part of the room, it was smooth sailing. In a matter of a few hours, I was over half-way done. It was decision time. Do I forge ahead into the evening and try to finish tonight? Or, do I call it good here and finish tomorrow? I was feeling pretty good, and it was going very well, so I decided to press on!

It took just a couple of more hours to complete the room, including a brief break for some Canadian bacon, scrambled eggs and toast for dinner. I was amazed, and quite pleased actually, at how square it turned out. I try to measure and cut carefully, but it seems impossible to end a job perfectly square. Well, this one turned out as close to perfect as any for me. It's even all along the walls. I won't even have to put quarter round along the baseboard, although I probably will just to add a traditional finish.

With the master bedroom, Loudres' office and the hallway (almost) complete, that just leaves my office yet to be done. I may not get to it for a couple of weeks, but I don't want to lose all my momentum. If I don't have to travel to Asia on business next week, I may get it done this coming weekend. If not, it will have to wait until early October. I'm getting close, I can feel it!

(Check out more pictures of the progress on Flickr.)

Monday, September 1, 2008

A real Labor Day

The plan was to get the floor done in the hallway this morning, then get started on my wife's office. So go the plans of mice and men. Mice would probably get this done quicker. Admittedly, I'm not rushing because I want it done right; I don't want to stare at mistakes or be tormented that I could have done a better job had I been more careful or taken a little more time.

Today, though, seemed to go a little extra slowly. The pieces didn't want to lock tightly without some strong "encouragement"--several whacks, firm but not too hard, with a mallet. As I would get one piece tight, a little gap would appear somewhere up the line. Back and forth, until the gentle beatings finally won over. I'm blaming that on the humidity.

At 6PM tonight, I finally had to give up as I tried to get the second piece in the last row to fit snugly. I'm afraid any more encouragement could break it. It has a notch cut out to go around the right side of one door jam and the left side of another with a short wall in between. My cut is pretty good, and I don't want to have to redo that, so I'm going to let it rest. I'll give it a go later this evening or early in the morning, hoping the humidity will be down.

My wife's office will have to wait, unfortunately. This week, I have already set aside Wednesday and Thursday evenings to work on the floor, so I should finish up the hallway and get a good jump on her office before the weekend. I have no other plans this weekend but working on the floor, which should allow me time to finish her office.

I can feel the muscles beginning to ache a little already from today's labor. Maybe an Epson Salt bath would be a good way to unwind for the day and possibly head off more aches and pains tomorrow. And a good night of sleep.

Thursday, August 21, 2008

Slow and steady... well, at least slow...

Most of July was lost on the big flooring project. I started to have abdominal pains, many days quite severe, that I just couldn't shake. My wife believes it was just my "nervous stomach" acting up over the anxiety of doing the floor. OK, that probably didn't help, but it certainly was not the only--and probably not the biggest--factor.

A couple of weeks ago, though, I finally started to make headway on the floor. I started in our master bedroom, as planned, finishing about 75% of the nearly 200 sq. ft. on a Saturday afternoon. Taking a couple of hours here and there, I installed the final piece in the MBR this past Sunday. As is typical for most projects, the final 4 pieces took about as long as the rest of the floor! Each one required tedious cuts along the wall and around door jams. I took my time trying to get it right, and I am very pleased with the results. (If you've ever installed flooring, especially interlocking laminate wood, you'll know why this wasn't so easy!)

Next is the hallway as I cross over to the smaller bedrooms. I want to install it without thresholds at the doorway, to give it a nice flow throughout all the rooms. This makes it a little trickier, but I think it will look very nice and be worth the effort.

Now that I'm back to taking Nexium to help with the abdominal pain, I should make steadier progress on the floor. My wife is so anxious that yesterday she started moving furniture out of her office and into mine (the temporary storage room for this project)! I'll get in there as soon as the hallway is done. She endured sleeping on the mattress on the floor in the MBR for a few weeks, so I don't want to test her patience too much on finishing her office. If I do, she's likely to pack her bags...

Sunday, July 6, 2008

Ambitious home improvement project

I have just embarked on our most ambitious home improvement project yet. As I've tweeted about, I a now the proud owner of over 750 square feet of laminate flooring. This is to replace the carpet in 3 bedrooms upstairs.

We selected the DuPont Real Touch® Elite Cherry Block laminate flooring product. It is supposed to be of better quality than most other laminate options at Home Depot, and it carries a 30-year warranty. So, after a good breakfast at a local diner, I spent my day off on Friday, July 4, 2008, ripping out carpet in my house. I had hoped to start to lay down some of the laminate flooring, but it turned out to be a bit more work just getting the carpet up than I anticipated. Bare stairsIn particular, the stairs were a nightmare. I have never installed carpet on stairs, so I didn't stop to think that it would be attached with hundreds upon hundreds of staples. Makes sense, but I just didn't think about it beforehand.

The hallway and the master bedroom were a breeze by comparison. I was actually able to get the carpet out of the master bedroom without removing all of the furniture. It just took a little strategic shuffling. Of course, the furniture has to come out before I can put down the new floor, but we don't have another place for it, yet. I need to clear out my office to make room for the furniture from the master bedroom. I have started that process, which is also taking more time than I counted on. I have set up a temporary office in our living room on a little cart. I figure this should be just inconvenient enough to encourage me to make rapid progress with the floor upstairs. I will have to mostly use evenings and weekends, but I hope to get the majority done by the end of the month (July). 

This will be my first time installing laminate flooring. I've done a lot of ceramic tile, and I've been told laminate is easier, so I figure I shouldn't have too much difficulty. Time will be the big thing.

One thing about the stairs. I've decided not to put laminate on them as originally planned. This will save some material, including the expensive trim pieces, but may also save time. The steps are a nice solid wood (probably fir), and should look nice if I finish them appropriately. If anyone has any suggestions, I'd love to hear them! I'll blog periodically throughout this adventure, so stay tuned for more. Also, I'll be uploading pictures of the progress on Flickr.